Geovian
← Back to Radar
Market and projectsDeadline 11/13/2026

Public consultation opens on the 19.8 MW Loki wind farm hybridising the Loki solar plant (Cadiz)

Cadiz's Delegacion Territorial de Sostenibilidad y Medio Ambiente has opened public consultation on the substantial modification of the unified environmental authorisation for «Parque Eolico Loki de 19,8 MW e infraestructura de evacuacion hibridado con PSFV Loki existente», promoted by Loki Solar, SL, in San Jose del Valle and Jerez de la Frontera (file AAU.CA.007.20.M1). Objections may be filed within thirty working days of publication. Hybridising wind onto a solar plant is the usual way of adding capacity without applying for a new access point.

WindSolarSan José del Valle· CádizJerez de la Frontera· Cádiz