Market and projects
Fausita Solar (188.2 MW) shelved in Murcia after the developer withdrew its application
The Dirección General de Política Energética y Minas has accepted the withdrawal by Desarrollos Renovables Iberia Alpha of its application for prior administrative authorisation, construction authorisation and a public-utility declaration for the «Fausita Solar» photovoltaic plant, 188.2 MW, and for part of its evacuation infrastructure, in the province of Murcia, and has closed file PFot-434. A project of this size dropping out stops occupying the access capacity tied to its connection point, and that is what matters to anyone looking for a connection in Murcia.
SolarMurcia· Murcia