Geovian
Back to Radar
Grid

New biomethane injection point authorised on the Gallur-Tauste-Ejea gas pipeline (Zaragoza)

Spain's Directorate-General for Energy Policy and Mines has granted Redexis Infraestructuras administrative authorisation and project approval for a new position on the Gallur-Tauste-Ejea de los Caballeros gas pipeline for biomethane injection at Tauste, Zaragoza. For a biomethane developer the injection point into the transmission network is what fixes where gas produced nearby can enter the system, and it shapes siting as much as land does.

BiomethaneTauste· Zaragoza