Geovian
← Back to Radar
Market and projects

Haza de las Tobas BESS storage authorised to hybridise its solar plant

Castilla-La Mancha's Directorate-General for Energy Transition has granted prior and construction authorisation to the Haza de las Tobas Bess storage installation, for the hybridisation of the Haza de las Tobas solar plant (reference 2713/00008). Hybridisation adds storage on the connection point and access capacity already assigned to the solar plant, without taking up new capacity at the node.

BESSSolarCastilla-La Mancha