Geovian
← Back to Radar
Market and projects

A Coruña Outer Port wind farm (19.8 MW) by Inditex Renovables authorised in Arteixo

The Xunta's Directorate-General for Renewable Energy and Climate Change has granted prior and construction authorisation to the A Coruña Outer Port wind farm, promoted by Inditex Renovables in the municipality of Arteixo (file AUT/2023/02). The installation has 19.8 MW of installed capacity and 18 MW of authorised, exportable capacity, with Siemens-Gamesa three-blade turbines, and an estimated output of 52,368 MWh a year. The authorised construction period is twelve months. The DOG also publishes an extract of the resolution.

WindArteixo· A Coruña