Market and projects
Aragón's INAGA rules out a full environmental assessment for the 2.8 MW Mur wind farm (Zaragoza)
Aragón's environmental agency INAGA has decided not to require a full environmental impact assessment for the 2.8 MW Mur wind farm and its evacuation infrastructure, and has issued its environmental impact report. The wind farm sits on several plots in polygons 33 to 36 of La Muela and polygons 3 and 4 of Muel (Zaragoza), and is promoted by Desarrollos del Pedrasa, SL (file INAGA 500306/01M/2024/06110). With the environmental step resolved through the simplified route, the project still needs its installation authorisations.
WindMuela, La· ZaragozaMuel· Zaragoza