Geovian
Back to Radar
Market and projects

Public consultation on the Parque Solar Torrente II solar plant (3.25 MW) in Picassent (Valencia)

The Valencian environment department has opened public consultation on the applications for non-developable land siting, prior and construction authorisation, occupation of drovers' roads and a public-utility declaration for the Parque Solar Torrente II solar plant and its evacuation infrastructure, in the municipality of Picassent (Valencia) (file ATALFE/2023/25/46). The plant declares 3.7962 MWp of modules, 3.25 MW installed and 3.2 MW of granted access capacity, and is going through simplified environmental assessment. The drovers'-road occupation is part of the same step.

SolarPicassent· Valencia