Market and projects
Public consultation on battery hybridisation at PFV Tordesillas 2022, Valladolid
The Valladolid territorial industry service has opened public consultation on the application for prior administrative authorisation of the modification to hybridise the «PFV Tordesillas 2022» solar plant with the «BESS PFV Tordesillas 2022» battery installation, in the municipality of Tordesillas (file FV-2580-ALM ATCE-100). This is the stage at which comments can be filed, and one more sign of how storage hybridisation is advancing on solar files in Valladolid.
SolarBESSTordesillas· Valladolid