Geovian
Back to Radar
Market and projects

Public consultation on hybridising the PS Sol de la Selva solar plant with 2,771 kW of batteries

Catalonia's territory, housing and ecological transition department has opened public consultation on the application for prior administrative and construction authorisation of the hybridisation extension of the PS Sol de la Selva solar plant, 2.7 MW, with a 2,771 kW energy storage system, on non-developable land in Caldes de Malavella (Girona), file FUE-2026-05143194. The storage applied for matches the solar field's power as stated in the file, and the procedure is opened as an extension of the plant rather than as a new installation.

SolarBESSCaldes de Malavella· Girona