Geovian
Back to Radar
GridDeadline 10/16/2026

Public consultation on changes to the evacuation infrastructure of the «El Perdigal» solar plant (Zaragoza)

The Zaragoza provincial service has opened public consultation on the prior administrative and construction authorisation for changes to the evacuation infrastructure of the «El Perdigal» solar PV plant, by Valdelafuén Renovables, SL (file G-SO-Z-256/2020). A change to evacuation infrastructure usually reshapes the route or the delivery point, which matters to anyone sharing the corridor or the node.

SolarZaragoza· Aragón