Geovian
Back to Radar
Market and projectsDeadline 10/8/2026

Public consultation on the 19.99 MW Solaria-Tordesillas II battery hybridisation (Valladolid)

Planta FV101, SL (Solaria group) has applied for prior and construction authorisation for the Solaria-Tordesillas II battery storage module, 19.993 MW, to be hybridised with the 49.969 MWp Solaria-Tordesillas II solar plant in Tordesillas (Valladolid). The notice states the PV plant is built and operating, with 40.625 MW of inverters, and that the batteries will evacuate through a 30 kV underground line to the existing Tordesillas II switching centre. Construction cost is put at EUR 8.16 million (file PFot-ALM-162); submissions run for fifteen working days from the day after publication.

BESSSolarTordesillas· Valladolid