Public consultation on the 36 MW Salinas I wind module hybridising the FV Salinas I solar plant (Cuenca)

The Industry and Energy Unit of the Government Sub-delegation in Cuenca has opened public consultation on the environmental impact study and the applications for prior and construction authorisation and for a declaration of public utility of the 36 MW «Hibridación FV-PEol Salinas I» wind module, in Campos del Paraíso, Rozalén del Monte and Alcázar del Rey, hybridising the existing 43.896 MW FV Salinas I solar plant into 79.896 MW. Evacuation runs through the ST PE Salinas 132/30 kV substation in Alcázar del Rey and a 132 kV line crossing Uclés, Tribaldos and Tarancón. Thirty days from the day after publication.

WindSolarCampos del Paraíso· CuencaRozalén del Monte· CuencaAlcázar del Rey· CuencaUclés· CuencaTribaldos· CuencaTarancón· Cuenca